Through years of work, we have gained the trust of a large number of clients thanks to our quality, reliability and expertise in the construction of solar power plants. Behind us are numerous successfully implemented projects – from smaller home systems to large commercial solar plants.
On this page you can see short descriptions of our selected projects and accompanying photos. Each project is the result of careful planning, professional installation and commitment to energy efficiency and sustainable solutions.
Courier service BEX, Pancevo
The first battery with a capacity of 1Mwh in Serbia, coupled with solar power plants installed on the roofs of the warehouse. The project also includes chargers for electric powered vehicles, because this company is completely turning to this type of vehicle, with a tendency to constantly increase green energy through the installation of solar power plants within their facilities throughout Serbia. Smederevo, Šabac, Novi Sad, Subotica and many other cities within this company were the subject of investments, and all solar power plants for this company were delivered and built by our company. Also, numerous projects for this company are pending, and for now – megawatts are at stake.
Courier service AKS, Šabac, Pancevo
Also, another company that has approached the transition to green energy very seriously is the company AKS based in Šabac, where it started investing in solar power plants, but soon spread to centers all over Serbia. So until now we have more than one megawatt of installed power plants for this company, with a plan to further invest in this area.
Refrigerator ABD prom, Jevremovac 400 kWh on the ground and 650 kWh on the roof
The project was partially financed from the IPARD fund, so it was necessary to comply with high standards and strict regulations, which we succeeded in completely. Refrigerators have a great need for electricity, so solar power plants are an excellent solution in reducing costs. Also, the electricity consumption within the refrigerators differs significantly during the seasons, so the design of solar power plants and adaptation to the needs is extremely important.
DTD Ribarstvo, Bački Jarak, 1.7 Mwh
A solar power plant with an installed capacity of 1.7 megawatts, within the approved project of 5 megawatts, which should be implemented in the coming years. The complete power plant was built on the ground, using the construction method. The working conditions were extremely unfavorable, with many rainy and cold days, but the investor’s deadlines were fully met.
Mill industry UNION Krnić
A very successful company within the milling industry, in order to reduce the increasing costs for electricity, by investing in solar power plants, has significantly changed the way it does business. So today, after installing a power plant of about 1Mwh, they abolished shift work, so that in addition to saving on electricity, the working conditions were also made easier.
Water factory MIONI, Delta Group, 550kWh
This was a demanding project, because the power plant had to be designed for installation on a SIKA insulation base, where there is no possibility of anchoring the structure to the roof surface, but on such bases we have to work with ballasts (weights) that are there to secure the power plant from wind blows. With such projects, one must take great care of statics, i.e. project the amount of weights needed for safety, and yet ensure that the roof can withstand it all.